Skip to main content

BMW logistics centre

Spartanburg, South Carolina, USA
Home » Our company » Our clients and projects » BMW logistics centre

Commissioning the logistics centre at the BMW Group Plant in Spartanburg, USA

Project scope

Commissioning the logistics centre at the BMW Group Plant in Spartanburg, USA
The AuTeBa experts worked closely alongside the BMW team in Spartanburg to commission the software system for the logistics centre. Once all the specific requirements for efficient operation of the logistics centre were identified, AuTeBa used its comprehensive expertise in logistics, material flow control and warehouse management – based on its decades of experience in delivering automation and control systems around the world – to complete the commissioning process.
An AuTeBa software solution, designed to enable continuous efficiency improvements through optimising material flows and to predict and minimise bottlenecks through extensive data recording, ensures the logistics centre runs smoothly. The result was the commissioning of a centre in Spartanburg with extremely efficient logistics processes, fast handling of goods and significantly improved delivery performance.

  • Programming conveyor belts for the high-bay warehouse
  • Programming logistics handling for the high-bay warehouse
  • Including programming operating terminals
  • Following approval and simulation

Sector:
Automotive

Location:
Spartanburg, USA

Delivered at/for:
BMW Group Plant logistics centre

Client:
Lödige Systems GmbH

Years:
2006-2007

Product used:
Siemens Software TIA Portal

Plus: TrySim simulation software